College North West London

The College of North West London (CNWL) was a £6m new build construction. The building, built of reinforced concrete, comprises of five storeys.

Battledore were commissioned to install the complete package of mechanical, electrical and public health services.

The college consists of 20 classrooms, which have been naturally ventilated via a perimeter heating unit located within the floor. Radiators and trench heating are fed from energy saving condensing boilers, all controlled through a trend building management system. Air conditioning was fed from a variant refrigerant flow system. The electrical installations consist of a new LV distribution system, high frequency lighting and control system, emergency lighting, fire alarms and associated works.